Distribution

1.Low pressure gas distribution system for Tien Hai Industrial Zone, Thai Binh:Objectives:
  • To construct low-pressure gas supply pipelines to supply natural gas to customers in Tien Hai Industrial Zone, modernize production line, increase the efficiency of factories, provide clean fuel alternatives to replace polluting ones, and contribute to local economic growth.
  • To construct Tien Hai Compressed natural gas (CNG) station to supply natural gas to consumer households in Northern Region other than in Tien Hai Industrial Zone.
Construction site and area: : LGDS and CNG station is located in Dong Co Commune, Tien Hai District, Thai Binh Province on an area of 2ha.
The Project consists of 2 components:
  • Low-pressure gas distribution pipeline.
  • CNG processing and distribution system.
Total investment capital: 1,311.3 billion VND
Capacity:
  • The Maximum designed capacity of the pipeline: 1 million m3 per day.
  • Capacity of CNG station: 150 million m3 per year.

Started Gas-in process on August 07th, 2015. In the upcoming time, PV GAS D will continue expanding CNG distribution system to supply CNG to customers in Northern region; upgrading and expanding its low pressure gas distribution system for customers in Tien Hai Industrial Zone, Thai Binh Province; and developing a back-up fuel supply system for low-pressure gas buyers in Tien Hai Industrial Zone, Thai Binh Province.
 

FullSizeRender10
2.Low pressure gas distribution system for Nhon Trach industrial zone (Dong Nai Province):

Objectives: To develop a low pressure gas distribution system to supply natural gas to customers in 09 centralized industrial zones (Nhon Trach I, II, III, V, VI, Nhon Trach II - Loc Khang, Nhon Trach II - Nhon Phu, Ong Keo IZ, Det May IZ) in order to expand the consumption market, contribute to socio-economic growth and promote sustainable development of Dong Nai Province, and reduce the severity of pollution in the industrial zones in compliance with the Law on Environment and regulations on environmental protection of the People's Committee of Dong Nai Province.
Phase 1: (From 2010 to 2012)
Total approved investment capital: 288.7 billion dong.
Accomplished investment in and construction of “low pressure gas distribution system for industrial zones in Nhon Trach District, Phase 1” project, consisting of main pipelines 10” and 14”; Nhon Trach low pressure gas distribution station (Nhon Trach LGDS); 6”, 4”, 3” branch pipes and 6 customers stations (Royal Ceramic, Hyosung, Bach Thanh, ChangYih, Caesar, Kim Phong).
Total system capacity is 2 million m3 per day.
Tie-in on the main pipelines and branch pipes, are installed for connection to gas customers ‘pipelines  in the future.
 


Phase 2: (From 2012 to 2017)
Total investment capital: 117.3 billion dong
Complete the low-pressure gas supply system for Nha Be Steel, Formosa, and Sam Hwan Vina.
Complete the construction of the 4" gas supply pipeline in Nhon Trach III Industrial Zone - Formosa on  the schedule and signed the gas sales and purchase contract with Chinwell.
PV GAS D continues making investment to expand the gas pipelines and station for the future customers.
 

3.Low pressure gas distribution system for Hiep Phuoc - Long Hau Industrial Zone, (Ho Chi Minh City):Objectives: To supply natural gas to customers in Hiep Phuoc Industrial Zone, Nha Be District, Ho Chi Minh City, and contribute to promote the local economic growth.
Total investment capital: 44.08 billion dong.
Capacity: Maximum system capacity is 300 million m3 per year.
The whole pipelines will be located within Hiep Phuoc Industrial Zone for supplying natural gas to consumer households in the Industrial Zone. The system connects with Tie –in at Hiep Phuoc gas distribution station, a part of Phu My - Ho Chi Minh City gas distribution pipeline project that is managed and operated by PetroVietnam Gas Joint Stock Corporation. Tie-in on the main pipelines and branch pipes,  are installed for connection to gas buyers ‘pipelines in the future.
PV GAS D continues making investment to expand the pipeline and gas station for future customers.
4.Low pressure gas distribution system for Phu My, My Xuan, and Go Dau Industrial Zones (Ba Ria - Vung Tau Province):Objectives: To supply natural gas to customers in Phu My, My Xuan, and Go Dau Industrial Zones.
Construction site and area: Go Dau central station is located in My Xuan industrial zone with an area of approx. 0.7ha; Off-take central station is located in the Industrial Zone with a construction area of 0.3ha.
Total investment capital: 6.5 million USD.
Capacity: Maximum system capacity is 3 million Sm3 per day, equivalent to 1,100 million Sm3 per year.
The project is constructed and developed by using advanced technologies and modern equipment to be imported from industrial countries of G7. The whole system is designed and installed synchronously with high flexibility in accordance with foreign standards, such as ASME B31.8, ASME B 31.3, API RP 520, NFPA 10, etc. Gas distribution system comprises of two main components, gas pipeline and gas stations. Main gas pipeline is linked from Off-Take Station to the central control station, where gas is distributed via branch pipes to customer-side gas supply stations. The pipelines are installed underground or inside solid concrete channels to prevent from any intervention during operation process.
The project has been brought into operation since 2004 and PV GAS D has continued investing to expand the pipelines and gas stations when has new customers.
5.Low pressure gas distribution system for Intermalt, Cai Mep Industrial Zone
Objectives:
To construct low-pressure gas supply pipelines to supply natural gas to Intermalt and potential customers in Cai Mep and Phu My 2 Industrial Zones, Tan Thanh District, Ba Ria - Vung Tau Province to increase the gas consumption, expand the natural gas market and also contribute to local economic growth.
Construction site and area: The gas pipeline is constructed through Phu My 1, Phu My 2 and Cai Mep Industrial Zones, Tan Thanh District, Ba Ria - Vung Tau Province.
Total investment capital: 59 billion VND
Capacity:
  • The Maximum designed capacity of the pipeline: 01 million m3 per day.
  • The capacity of 8" branch pipeline for Cai Mep and Phu My 2 IPs: 0.63 million m3 per day.
First Gas on 13/08/2017. Tie-in on the main pipeline 10 "and branch pipe 8", are installed for connection to gas customers’pipelines  in the future.